Available Only at Our Abilene Location!
Our Abilene location now offers an expanded plumbing and septic product selection to support every stage of plumbing, from underground infrastructure to final trim-out—all in one place.
Abilene-Exclusive Inventory Includes:
-
Septic tanks & lift stations
-
DWV, PEX, Schedule 40 & 80 PVC pipe and fittings
-
SDR35 sewer pipe & perforated drain pipe
-
Sanitary fittings, P-traps, pipe insulation
-
Septic leach field chambers, Tuf-Tite risers & geotextile fabric
-
Backflow devices, safety plates (nail guards)
-
Angle stop valves & trim kits
-
Braided stainless-steel faucet supply connectors
Your Local Source for Every Stage of Plumbing
Whether you’re building from the ground up or planning a renovation, we provide the products, expertise, and support to help you get the job done right—the first time. From underground rough-in to final trim-out, we’re your trusted local source for all three stages of plumbing.
Stage 1: Underground Rough-In
This foundational stage includes installing drain, waste, vent (DWV), and water supply lines beneath the ground and within walls before concrete is poured or walls are closed. Proper layout ensures gravity-fed drainage, correct venting, and long-term system performance. All lines are pressure-tested before moving forward.
Key Products & Components
-
DWV, PEX, Schedule 40 & SDR35 pipe
-
DWV, PEX, Schedule 40 & sanitary fittings
-
Sewer cleanouts and access points
-
Septic tanks, lift stations, leach field chambers
-
Perforated drain pipe, geotextile septic fabric, septic risers
Stage 2: Top-Out (Above-Ground Rough-In)
During top-out, vertical water supply, drain, vent, and gas lines are installed inside walls and routed through the roof. This phase prepares the structure for fixtures and appliances and must pass inspection prior to drywall. Pressure testing ensures system integrity.
Key Products & Components
-
DWV, PEX, Schedule 40 & Schedule 80 pipe
-
DWV, PEX, Schedule 40 & Schedule 80 fittings
-
Shut-off valves, backflow preventers, pressure regulators
-
Vent stacks, P-traps, nail guards (safety plates), pipe insulation
Stage 3: Trim-Out
Trim-out is where the system comes together. After drywall installation, fixtures and appliances are connected to the rough-in lines, blending performance with design. Final testing ensures efficient, leak-free operation.
Key Products & Components
-
Angle stop valves
-
Braided stainless-steel faucet supply hoses/connectors
-
Wax toilet rings
-
Fixture trim kits















